• Nacala Road Corridor Development Project Phase 4 The Nacala Road Corridor Development project is a joint project between the countries of Malawi, Mozambique, and Zambia. It seeks to develop a transport  infrastructure that links the Indian Ocean Port of Nacala in Mozambique  to Malawi, and through Malawi into Zambia and beyond. The corridor starts from Nacala Port in Mozambique to  the Malawi boarder town of Chiponde. ...
  • Rehabilitation of Mzuzu-NkhataBay Road (M5) The road from Mzuzu to Nkhata-Bay is a 46km long. It connects the Mzuzu City – biggest city in the North to the Nkhata-Bay on the shores of Lake Malawi. The road was built in the early seventies and had bitumen however the road has since leaved its life span and has since deteriorated making travelling along ...
  • Upgrading of Lirangwe-Chingale-Machinga Road Project The 61.2 km long, Lirangwe-Chingale-Machinga Road designated as S139 starts at Lirangwe Trading Centre in Blantyre District. It extends northwards passing through Chingale and Chinseu Trading Centres. The road passes through the gentle undulating plains of the western side of Zomba mountain traversing through swampy areas at Chingale. The project works will involve upgrading the existing earth standard ...
  • Upgrading of Rumphi-Nyika-Chitipa Road Project The upgrading of Rumphi-Nyika-Chitipa road is one of the planned/upcoming project in the pipeline. Traversing a length of 272 km, the project will upgrade two roads designated as Main roads (M24 road from Rumphi  District – Nyika and M09 from Nyika-  Chitipa. Currently the road is of earth standard and will be upgraded to bitumen Class 1. ...
  • Thyolo – Thekerani – Muona – Bangula Road (S151) Thyolo – Thekerani – Muona – Bangula Road (S115)  is a 92km long stretch from a  Trading Centre near Thyolo District and extends southwards to Bangula Trading Centre in Nsanje District. The project is for upgrading of the existing earth road to Bitumen Standard Class 1 including several bridges, box and Armco culverts. The works will involve ...
  • Upgrading of Zomba – Jali – Phalombe – Chitakale Road (S144/S147) The Zomba-Jali-Phalombe-Chitakale is a 102 km long road project that starts from Zomba Air wing through trading centres of Jali, Misewu-Folo, Phalombe Boma and ends at Chitakale right at the foot of great Mulanje Mountain in the Southern region of Malawi. The project is co-financed by the Malawi Government and cooperating partners:-Kuwait Fund, Opec Fund for ...