• Lilongwe Old airport – Kwanyanda- Santhe (S117) and Kasiya Spur (T342) Road Project The 95 km long, Lilongwe Old Airport-Kwanyanda-Santhe (S117) and Kasiya spur (T342) road project starts from the M12  ( the Lilongwe to Mchinji road). It extends westwards passing through Nsalu-Kabudula and Kwanyanda Trading Centres. It joins the the M18 at Santhe Trading Centre in Kasungu District. The project involves upgrading of the existing earth road to class 1 bitumen standard, ...
  • Upgrading of Jenda-Edingeni Road Project The project is for upgrading of 53 km  long road to bitumen standard – class 1 from Jenda to Edingeni. The carriage way will be widened to 6.7m and have a 1.5m sealed shoulders on either side. It is classified as a Secondary and is designated as (S112) and is located in the administrative Northern Region of Malawi. The road is ...
  • Upgrading of Milepa-Chiladzulu road section (S145) The upgrading of Milepa-Chiladzulu road section is part of the upgrading of the Chiringa-Migowi-Miseu Folo-Chiladzulu and the Nguludi spur road project. The project is to upgrade the road from gravel surface to class 1 bitumen. This 21.4 km section starts at Milepa and stops at Chiladzulu boma. The construction works comprise widening and sealing of the ...