Main Menu
Accelerating Malawi’s Economic Growth
Reha­bil­i­ta­tion and Reseal­ing of the Chikhwawa – Ngabu – Ban­gu­la Road (M1) The 81.7 km Chik­wawa – Ngabu – Ban­gu­la Road is a sec­tion of the main back­bone road des­ig­nat­ed as M1 which tra­vers­es across Malawi from Karon­ga in the North­ern region of Malawi to Mar­ka in Nsan­je in the south. As a sec­tion of the main road, and its sig­nif­i­cance to the econ­o­my, the Malawi Gov­ern­ment iden­ti­fied funds to reha­bil­i­tate and reconstruct .… 
Reha­bil­i­ta­tion of Mzuzu-NkhataBay Road (M5) The road from Mzuzu to Nkha­ta-Bay is a 46km long. It con­nects the Mzuzu City – biggest city in the North to the Nkha­ta-Bay on the shores of Lake Malawi. The road was built in the ear­ly sev­en­ties and had bitu­men how­ev­er the road has since leaved its life span and has since dete­ri­o­rat­ed mak­ing trav­el­ling along … 
Lilong­we Old air­port – Kwanyan­da- San­the (S117) and Kasiya Spur (T342) Road Project The 95 km long, Lilong­we Old Air­port-Kwanyan­da-San­the (S117) and Kasiya spur (T342) road project starts from the M12 ( the Lilong­we to Mch­in­ji road). It extends west­wards pass­ing through Nsalu-Kabudu­la and Kwanyan­da Trad­ing Cen­tres. It joins the the M18 at San­the Trad­ing Cen­tre in Kasun­gu Dis­trict. The project involves upgrad­ing of the exist­ing earth road to class 1 bitu­men standard, … 
Upgrad­ing of Jen­da-Edin­geni Road Project – Lot 1 The project is for upgrad­ing of 53 km long road to bitu­men stan­dard – class 1 from Jen­da to Edin­geni. The car­riage way will be widened to 6.7m and have a 1.5m sealed shoul­ders on either side. It is clas­si­fied as a Sec­ondary and is des­ig­nat­ed as (S112) and is locat­ed in the admin­is­tra­tive North­ern Region of Malawi. The road is … 
Upgrad­ing of Milepa-Chi­ladzu­lu road sec­tion (S145) The upgrad­ing of Milepa-Chi­ladzu­lu road sec­tion is part of the upgrad­ing of the Chiringa-Migowi-Miseu Folo-Chi­ladzu­lu and the Ngu­lu­di spur road project. The project is to upgrade the road from grav­el sur­face to class 1 bitu­men. This 21.4 km sec­tion starts at Milepa and stops at Chi­ladzu­lu boma. The con­struc­tion works com­prise widen­ing and seal­ing of the …